Loading...

Wenzhou Tuopu Glasses Co.,Ltd

AQL for Eyewear Shipments: Sampling Plans, Defect Classes and Inspection Records

Timeㄩ2026/11/28AuthorㄩadminFlowㄩ 9



A container of frames is either accepted or rejected on the strength of a document that most buyers read once and file. The document says something like "AQL 2.5/4.0, 125 pieces inspected, 8 major defects found, result: fail". Whether that is a fair verdict depends on three things that were decided months earlier, when the inspection protocol was signed, usually without much thought.

Those three things are the sampling level, the three AQL values and the defect classification. Get them right and the report becomes a tool for managing the supplier. Get them wrong and it becomes an argument you lose, because the supplier is measuring against a standard you agreed to.

What an AQL plan does, and what it does not

Acceptance sampling is a commercial compromise, not a measurement of quality. It accepts that some defective units will pass and some good lots will fail, and it balances those two risks at a level both sides can live with. An AQL of 2.5 does not mean "2.5% defects is acceptable"; it means that lots at 2.5% defective have a defined, high probability of being accepted, and lots well above that have a high probability of being rejected.

Two consequences follow. First, AQL protects the supplier against a buyer rejecting a good lot on a bad sample. Second, it does not protect the buyer from a supplier who ships consistently just under the limit. If you need a tighter outcome, you change the AQL, not the argument after the report arrives.

Three values, not one

Eyewear inspections almost always run three defect classes in parallel, because a scratched temple and a detached hinge are not the same commercial event.

Class

Typical AQL

What belongs here

Critical

0

Safety failures and regulatory failures: sharp accessible edges, lens breakage, hinge separation, detachable small parts on children's frames, missing or wrong conformity marking

Major

2.5

Function and appearance failures a customer would reject: visible lens scratches, plating blistering, loose or stripped screws, leg length mismatch, colour clearly off the approved sample

Minor

4.0

Deviations that do not stop a sale: faint polish marks, light flow lines on the inner surface, slight print offset, scuffed inner carton


The critical class is where buyers most often go wrong, and they go wrong by being too generous. A critical defect at AQL 0 means one occurrence rejects the lot, with no sampling mathematics involved. Anything that can injure a wearer, or that makes the product illegal to sell in the destination market, belongs in that class rather than in "major".

From lot size to sample size

The sample size is not chosen; it is read off a table. Under ISO 2859-1, which is mirrored by GB/T 2828.1, general inspection level II gives a sample size code letter from the lot size, and the letter gives the number of pieces to inspect.

Lot size

Code letter

Sample size

151每280

G

32

281每500

H

50

501每1,200

J

80

1,201每3,200

K

125

3,201每10,000

L

200


Level II is the default for visual and dimensional checks. The special levels S-1 to S-4 exist for destructive or expensive tests, such as impact testing where the sample is consumed, and they produce much smaller samples at the same lot size. A protocol that uses S-4 for impact resistance and level II for everything else is normal and defensible; a protocol that uses S-4 for visual inspection is a protocol that inspects almost nothing.

Reading the acceptance number

The acceptance number (Ac) is the largest number of defects that still passes the lot. The rejection number (Re) is the first count that fails it. They move with the sample size, and this is why two AQL values that look far apart behave almost identically at small volumes.

Sample size

AQL 2.5 (Ac / Re)

AQL 4.0 (Ac / Re)

Practical gap

80

5 / 6

7 / 8

Two extra defects allowed

125

7 / 8

10 / 11

Three extra defects allowed

200

10 / 11

14 / 15

Four extra defects allowed


The absolute gap widens as the sample grows, but the proportional difference stays roughly the same. In practice this means the choice between 2.5 and 4.0 changes the outcome for a lot sitting near the boundary, and changes nothing for a lot that is clearly good or clearly bad. Buyers who spend weeks negotiating 2.5 against 4.0 while ignoring the defect classification have optimised the wrong variable.

Where the argument actually happens:not in the AQL number but in whether a given defect is counted as major or minor. Reclassifying three defect types from major to minor can shift a failing lot to a passing one without touching a single AQL value.

The eyewear defect catalogue

A protocol that names defects is worth more than one that quotes numbers, because it removes the inspector's discretion. The table below is a starting point to be adapted to the specific frame family.

Defect

Class

Disposition

Sharp accessible edge on metal or acetate

Critical

Reject lot; 100% sort before re-inspection

Hinge separation or screw pull-out under normal force

Critical

Reject lot; review hinge specification

Missing, wrong or illegible conformity marking

Critical

Hold lot; remarking decision by buyer

Visible lens scratch in the central zone

Major

Count against major Ac/Re

Plating blister, peel or pinhole

Major

Count against major Ac/Re

Temple length or angle mismatch beyond tolerance

Major

Count against major Ac/Re; check pairing

Colour clearly outside the approved sample

Major

Count against major Ac/Re; verify against golden sample

Faint polish mark on the inner surface

Minor

Count against minor Ac/Re

Slight logo print offset within limit

Minor

Count against minor Ac/Re

Scuffed or dented inner carton

Minor

Count against minor Ac/Re; assess transit risk


What the report must contain

An inspection report that cannot be audited six months later is a report that will be argued about. Eight fields make the difference.

1.      Order reference〞 PO number, SKU, colour, quantity offered for inspection.

2.      Sampling plan〞 standard, inspection level, the three AQL values, code letter and sample size actually drawn.

3.      Who and where〞 inspector, date, factory or warehouse, and whether production was complete at the time of inspection.

4.      Defect log〞 every defect listed individually with piece number, description, class and photo reference, not just a total.

5.      Counts and verdict〞 defects per class against Ac/Re, and the resulting accept or reject decision.

6.      Measured data〞 the actual dimensions and functional results, not only pass or fail.

7.      Packing and marking check〞 carton marks, barcodes, language, conformity marking, artwork version.

8.      Photographic evidence〞 the stacked lot, the drawn sample, each defect type in close-up, the packing, and the sealed carton.

When the lot fails

A failed inspection is a decision point, not an ending. Three routes are standard, and the choice should be written into the protocol before the first shipment rather than negotiated under pressure.

﹞      100% sorting〞 the supplier screens every piece for the specific defect class that failed, then re-inspection runs at tightened level. Appropriate when the defect is isolated and the cause is known.

﹞      Rework and re-inspect〞 appropriate when the defect is correctable, such as a print offset or a loose screw, but only if the rework does not create a second defect class.

﹞      Reject and re-produce〞 appropriate when a critical defect traces back to a process or material choice rather than an operator error. Sorting a lot with a systematic hinge problem produces a sorted lot with a systematic hinge problem.

Tightened inspection under ISO 2859-1 is the formal version of "we do not trust this line yet": it raises the sample size at the same AQL until a defined number of lots has passed. Writing that rule into the protocol in advance converts a dispute into a procedure.

Frequently asked questions

Should critical defects ever be sampled?

No. Critical defects are set at AQL 0, which means any single occurrence rejects the lot. Sampling still happens, but the acceptance number is zero rather than a calculated allowance.

Is AQL 2.5 stricter than AQL 4.0?

Yes. A lower AQL accepts fewer defects. At a sample of 125, 2.5 allows seven major defects and 4.0 allows ten, so the difference only decides lots sitting near the boundary.

Why does the sample size not depend on the AQL value?

Under ISO 2859-1 the sample size comes from the lot size and the inspection level; the AQL sets the acceptance number applied to that sample. Changing the AQL changes the verdict, not the workload.

Can I use the same protocol for frames and sunglasses?

The sampling mathematics carry over, but the defect catalogue does not. Sunglasses add lens-specific defects, category marking and transmission documentation that frames do not have, and those belong in the critical class.

Who should pay for the inspection?

That is a commercial term, not a quality term, but it belongs in the same document. The important part is that the inspection happens before shipment and that the report reaches the buyer before the balance payment falls due.